I attended the meeting last night, and although I think everyone (including the CoS Planners) would prefer that a road did not have to go through this beautiful park, it seems that in order to prepare for future growth and road demand, this road will have to be necessary.
I do think the residents should still advocate for Skytrain on 104 Avenue instead of LRT, but either form of train is going to require some more road network to be built in this area, so unfortunately, I can only see that this "two lane" road will have to be built. It will include raised cycling paths as well as Street Trees and Sidewalks, so will provide a safe way for Pedestrians and Cyclists to travel East-West in this part of Surrey. In speaking with a CoS Planner, it was mentioned that the construction of the Port Mann/ City Centre Bike Corridor (with Bon Accord Bridge), was also built partly as an acknowledgement that it would not be feasible to build bike lanes on 104 Avenue.
Does anyone else have thoughts on this network?